
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 13, 2026 (MIYERKULES), 7:00 AM- 4:00 PM (9 ka oras ang kalawigon) kag MAYO 16, 2026 (SABADO), 7:00 AM- 4:00 PM (9 ka oras ang kalawigon) para sa pag-ilis sang poste, pag-clearing sang linya kag pagpatigayon sang iban pa nga technical… Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69kV Concepcion-Estancia Transmission Line sa MAYO 16, 2026 (SABADO). Ang petsa, oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 16, 2026 (SABADO) 5:00 AM- 7:00… Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MARSO 08, 2026 (DOMINGO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-construct sang linya kag iban pa nga technical activities. Ang mga lugar nga apektado sang sini nga power interruption sa banwa sang BATAD amo mga masunod: •… Read more
NEWS AND UPDATES
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more
Dry your clothes and dishes naturally. Read more
HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more
Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more
BIDS AND NOTICES
Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more