
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa SETYEMBRE 28, 2024 (SABADO), 7:00 AM- 8:00 AM (1 ka oras ang kalawigon) para sa patigayunon nga spot correction sa 69kV connection side sa Daan Banwa Substation. Ang lugar nga apektado sang sini nga power interruption amo ang masunod: • SARA •… Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 29, 2024 (DOMINGO), 5:00 AM-6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga Preventive Maintenance sa Pani-an Substation, clearing sang linya, kag pag-ilis sang poste. Ang lugar nga apektado sang sini nga power interruptions amo ang masunod: • CARLES… Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 28, 2024 (SABADO), 5:00 AM-6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga Preventive Maintenance sa Daan Banwa Substation, clearing sang linya, pag-ilis sang poste kag pag convert sang linya. Ang lugar nga apektado sang sini nga power interruptions… Read more
NEWS AND UPDATES
https://www.facebook.com/watch/live/?ref=watch_permalink&v=627386142826200 Read more
ILECO III conducted a benchmarking activity at Aklan Electric Cooperative, Inc. (AKELCO) on its Complaint Management System, GPS Tracking System for service vehicles and other best practices on August 03, 2023 (Thursday). AKELCO family headed by General Manager, Atty. Ariel B. Gepty, together with their Management Committee warmly welcomed ILECO III to their Main Office… Read more
Also in attendance were Ms. Christine Joy G. Hermano, ISD Manager, Mr. Alex A. Demandante, MSD Chief, Mr. Joel C. Datoon, BEA President and other ILECO III and BEA Officers. For your information. Read more
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more
BIDS AND NOTICES
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditure Projects Read more
Procurement of Security Services Requirement of ILECO III Read more
Procurement of Protection and Isolation Equipment Read more