• UPDATE ON UNSCHEDULED POWER INTERRUPTION As of April 27, 2023, 9:55 PM

    ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more

  • NGCP MANUAL LOAD DROPPING

    Ginapahibalo ang tanan nga mga katapo-konsumidores sang ILECO III nga naga-implementar sang ROTATING POWER INTERRUPTION ang aton Kooperatiba bangud sang MANUAL LOAD DROPPING (MLD) sang National Grid Corporation of the Philippines (NGCP). Ang apektado sang rotational power interruption amo ang mga masunod nga lugar:ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, AJUY, SARA, LEMERY, CONCEPCION, SAN DIONISIO,… Read more

  • UPDATE ON UNSCHEDULED POWER INTERRUPTION As of April 27, 2023, 9:30 PM

    ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more

  • Dapat naton e-consider bag-o kita mag-attend sa aton ika-33rd Annual General Membership Assembly o AGMA sa Abril 12, 2025

    Tandaan ang mga tips sa idalom agud maproteksyunan ka sa init, uhaw kag dal-on lamang ang mga importante nga bagay sa ti-on sang aktibidad. Madamo guid nga salamat ka-MCO! Magkilita-ay kita liwat kag magda-ug sang dalagko nga papremyo halin sa inyo kooperatiba. Ang nagapahibalo, ATTY. JAMES G. BALSOMO II, MBA, DM Read more

  • 6 DAYS TO GO BEFORE ILECO III’s 33rd AGMA

    APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more

  • 7 DAYS TO GO BEFORE ILECO III’s 33rd AGMA

    APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more

  • 8 DAYS TO GO BEFORE ILECO III’s 33rd AGMA

    APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more