• POWER RESTORATION UPDATE

    As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 10:12 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • BOLA PARA SA PAG-ASA

    As part of the cooperative’s wellness program, ILECO III conducted a Corporate Social Responsibility dubbed, “BOLA PARA SA PAG-ASA” that aims to foster harmonious relationship and strong bond with our valued MCOs, partner organizations and other stakeholders. The Friendship Basketball Game was organized between ILECO III Warriors and Brgy. Guinticgan All Star Basketball Team in… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more