• EMERGENCY PLANT SHUTDOWN SANG NPC-SPUG SA HULYO 13, 2022 TUBTOB HULYO 27, 2022 SA ISLA GIGANTES

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY PLANT SHUTDOWN ang NATIONAL POWER CORPORATION (NPC)- SPUG nga magasugod sa HULYO 13, 2021 (MIYERKULES) tubtob kinse (15) ka adlaw, 7:00 AM- 12:00 NN (lima ka oras ang kalawigon) kag 5:00 PM- 12:00 MN (pito ka oras ang kalawigon) bangud sang load shedding para sa patigayunon nga maintenance… Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 13, 2022)

    Date: July 13, 2022 (Wednesday) Time of interruption: 5:50 AM Time of restoration: 7:45 AM Affected areas: Balunos, Guipis and Manganese, Anilao, Iloilo Cause: Line fault due to animal contact (bat) Activities: Inspection of line and pulled out animal We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 13, 2022)

    Date: July 13, 2022 (Tuesday) Time of interruption: 6:30 AM Time of restoration: 7:31 AM Affected areas: San Rafael (All barangays) and Barotac Viejo (portion) Activity: Repaired source of primary section analyzing cut-out We apologize for the inconvenience. For your information. Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2024

    For your information. Read more

  • GRID ALERT STATUS FROM NGCP

    𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more