• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 29, 2023)

    Date: November 29, 2023 (Wednesday) Time of interruption: 9:55 AM Time of restoration: 3:30 PM Affected areas: Brgy. Tiabas and Brgy. Sua, San Dionisio Activity: Replacement of two (2) rotten poles We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BAROTAC VIEJO SA DISYEMBRE 5, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa DISYEMBRE 05, 2023 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga conversion sang Open Secondary Line pakadto sa Single Phase Line. Ang lugar nga apektado sang sini nga power interruption sa BAROTAC VIEJO amo ang masunod:… Read more

  • SCHEDULE POWER INTERRUPTION SA BANWA SANG BATAD SA DISYEMBRE 8, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa DISYEMBRE 08, 2023 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-ilis sang mga poste kag iban pa nga technical activities. Ang lugar nga apektado sang sini nga power interruption amo ang Jaleco Village, Poblacion, Batad. Madamo gid… Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2024

    For your information. Read more

  • GRID ALERT STATUS FROM NGCP

    𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more