• SCHEDULED PREVENTIVE MAINTENANCE SA BANWA SANG ANILAO, BANATE, BAROTAC VIEJO, KAG SAN RAFAEL SA OKTUBRE 20, 2024

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer 2 sa Dingle Substation sa OKTUBRE 20, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: OKTUBRE 20, 2024 (DOMINGO) 6:00 AM- 6:00 PM… Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: October 03, 2024 (Thursday) Time of interruption: 6:33 AM Estimated time of restoration: NOTE YET DETERMINED Affected areas: Bulak Sur and Alapasco, Batad, Iloilo Cause: Replacement of poles For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: September 29, 2024 (Sunday) Time of interruption: 9:49 AM Time of restoration: 10:23 AM Affected area: Brgy. Pasig, Juaneza and Aposaga, Sara Cause: Vegetation (Bamboo Tree) on Pole Number 0335 of SF1 Activity: Pole to Pole Inspection of primary line, refusing and clearing of line. For your information. Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2024

    For your information. Read more

  • GRID ALERT STATUS FROM NGCP

    𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more