• ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 09, 2025 (Friday) Time of power interruption: 6:02 PM Estimated time of power restoration: 6:32 PM Duration: 30 minutes Cause: Repair of damaged primary jumper cut-off Affected areas: Municipality of Sara Aguirre Antonio Yusay/PasigApologista (Portion) Aspera Ardemil Bato Del Castillo Domingo Juaneza Latawan Malapaya MuycoPoblacion Ilaya Poblacion Market Poblacion Ilawod Tady For your… Read more

  • ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 07, 2025 (Wednesday) Time of power interruption: 8:30 PM Estimated time of power restoration: 9:30 PM Duration: 1 hour Cause: Repair of damaged cut-out assemble center phase Affected areas: Santol, Bondulan, Poblacion, Siempreviva, Pase and Capinang, San Dionisio Aglosong and portion of Bacjawan Norte, Concepcion For your information. Read more

  • REPOSTING POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO)… Read more

  • Power Rates for the Month of June 2022

    The minimal INCREASE for Residential Consumers for the Month of June 2022 compared to the previous month is due to the increase in Transmission Charge. The drastic increase of the said charge was triggered by 47.29% increase of Ancillary Service Charge from 2.9M PhP (April 2022 power bill) to 4.3M PhP (May 2022 power bill)… Read more

  • Father’s Day Special

    To honor our Dad/Tatay/Papa this Father’s Day, join our FATHER’S DAY SPECIAL and win exciting prizes! HOW TO JOIN:1. Share with us below your best photo with your father or father figure.2. Tag/Mention him.3. Tell us one special thing about him.4. And make sure to use #ILECO3FathersDay in your caption for your entry tobe officially counted. Five… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF JUNE 2022

    For your information. Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Valid… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more