
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. *A friendly reminder from ILECO III. Read more
ILOILO III ELECTRIC COOPERATIVE, INC. celebrates with Barotacnon (Viejo) on thier celebration of feast of San Pedro de Apostol, June 29, 2022. Read more
The 42-day training of Thirty Three (33) participants, 5 of which are from Guimaras Electric Cooperative, Inc. (GUIMELCO), 10 from Iloilo II Electric Cooperative, Inc. (ILECO II) and 18 from Iloilo III Electric Cooperative, Inc. (ILECO III) has come to an end. ILECO III conducted the Graduation Program for EPDLC Training Course on June 28,… Read more
Kuha-on sa saksakan ang mga appliances nga wala ginagamit. *A friendly reminder from ILECO III. Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more