• SCHEDULED POWER INTERRUPTION SA BANWA SANG BATAD SA OKTUBRE 22, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 22, 2024 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-clearing sang linya kag pag-ilis sang pole top pin. Ang lugar nga apektado sang sini nga power interruption sa banwa sang BATAD amo ang: • Bulak Sur… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG SARA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SARA amo ang masunod: OKTUBRE 21, 2024 (LUNES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Zerrudo • Apologista OKTUBRE 22,… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG CARLES SA OKTUBRE 18, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 18, 2024 (BIYERNES), 12:00 NN- 4:00 PM (4 ka oras ang kalawigon) para sa pagkay-o sang termination sang submarine cable. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CARLES amo ang: • Lantangan • Gabi Madamo gid… Read more

  • ELECTRIC POWER DISTRIBUTION LINE CONSTRUCTION TRAINING COURSE GRADUATION PROGRAM

    The 42-day training of Thirty Three (33) participants, 5 of which are from Guimaras Electric Cooperative, Inc. (GUIMELCO), 10 from Iloilo II Electric Cooperative, Inc. (ILECO II) and 18 from Iloilo III Electric Cooperative, Inc. (ILECO III) has come to an end. ILECO III conducted the Graduation Program for EPDLC Training Course on June 28,… Read more

  • ILECO III ENERGY SAVING TIP

    Kuha-on sa saksakan ang mga appliances nga wala ginagamit. *A friendly reminder from ILECO III. Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. BATITI, CONCEPCION, ILOILO

    The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Batiti, Concepcion, Iloilo on June 27, 2022 (Monday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred (100) member-consumer-owners (MCOs) of the said barangay. In addition, ILECO III also conducted Information Education Campaign (IEC) Program… Read more

  • ILECO III ENERGY SAVING TIP

    Pag-gamit sang energy efficient nga appliances kag pag-gamit sang mga LED bulbs. *A friendly reminder from ILECO III. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more