
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
ILOILO III ELECTRIC COOPERATIVE, INC. joins BalaseƱos on its Annual Town Fiesta, July 26, 2022. HAPPY FIESTA BALASAN! Read more
Ano ang Republic Act No. 11361 ukon ang Anti-Obstruction of Power Lines Act? Read more
Happy birthday HON. NIELO C. TUPAS, Municipal Mayor- Barotac Viejo, Iloilo. From ILECO III Family! Read more
Pahibalo sa mga katapo-konsumidores nga ang HULYO 26, 2022 (MARTES) ang gina-obserba nga LOCAL HOLIDAY sa banwa sang BALASAN para sa pag-selebrar sang KAPISTAHAN NI STA. ANA (Feast Day of St. Anne). Ang opisina sang Pani-an Area Office ang magapabilin nga BUKAS sa nasambit nga adlaw, halin 8:00 AM tubtob 4:00 PM para sa pag… Read more
BIDS AND NOTICES
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more
Procurement of Boom Truck Read more