• POWER RESTORATION UPDATE

    As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 10:12 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more

  • UNDERSTANDING THE POWER BILL AND RATE COMPOSITION

    Ang tanan nga rate sang isa ka Electric Cooperative (EC) gina-approve sang Energy Regulatory Commission (ERC) bag-o ini paga-sukton sa mga konsumidor. Ano bala ang ka-undan sang aton mga power bill kag diin ini nagakadto? GENERATION SYSTEM CHARGEIni ang ginasukot sang mga Electric Cooperatives para bayaran ang ginakuha nga kuryente halin sa mga power suppliers.… Read more

  • HOME OWNERS ASSOCIATION AND BAPA OFFICERS JOINT MEETING IN NHA VILLAGE DAYHAGAN, CARLES

    ILECO III personnel conducted Home Owners Association and BAPA Officers Joint Meeting in NHA Village, Dayhagan, Carles, Iloilo with 11 attendees today, July 29, 2022 (Friday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN NHA VILLAGE, BACJAWAN SUR, CONCEPCION

    Instead of going to the Main Office at Preciosa, Sara, Iloilo, ILECO III conducted an on-site Pre-Membership Seminar to 116 applicants at NHA Village, Bacjawan Sur, Concepcion, Iloilo. This is the first step in applying an electric service connection. The regular pre-membership seminar is held at the Main Office every Tuesday & Thursday. Registration starts… Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more