
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
Ang tanan nga rate sang isa ka Electric Cooperative (EC) gina-approve sang Energy Regulatory Commission (ERC) bag-o ini paga-sukton sa mga konsumidor. Ano bala ang ka-undan sang aton mga power bill kag diin ini nagakadto? GENERATION SYSTEM CHARGEIni ang ginasukot sang mga Electric Cooperatives para bayaran ang ginakuha nga kuryente halin sa mga power suppliers.… Read more
ILECO III personnel conducted Home Owners Association and BAPA Officers Joint Meeting in NHA Village, Dayhagan, Carles, Iloilo with 11 attendees today, July 29, 2022 (Friday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more
GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more
Instead of going to the Main Office at Preciosa, Sara, Iloilo, ILECO III conducted an on-site Pre-Membership Seminar to 116 applicants at NHA Village, Bacjawan Sur, Concepcion, Iloilo. This is the first step in applying an electric service connection. The regular pre-membership seminar is held at the Main Office every Tuesday & Thursday. Registration starts… Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more