• SCHEDULED PREVENTIVE MAINTENANCE SA BANWA SANG ANILAO, BANATE, BAROTAC VIEJO, KAG SAN RAFAEL SA OKTUBRE 20, 2024

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer 2 sa Dingle Substation sa OKTUBRE 20, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: OKTUBRE 20, 2024 (DOMINGO) 6:00 AM- 6:00 PM… Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: October 03, 2024 (Thursday) Time of interruption: 6:33 AM Estimated time of restoration: NOTE YET DETERMINED Affected areas: Bulak Sur and Alapasco, Batad, Iloilo Cause: Replacement of poles For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: September 29, 2024 (Sunday) Time of interruption: 9:49 AM Time of restoration: 10:23 AM Affected area: Brgy. Pasig, Juaneza and Aposaga, Sara Cause: Vegetation (Bamboo Tree) on Pole Number 0335 of SF1 Activity: Pole to Pole Inspection of primary line, refusing and clearing of line. For your information. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN NHA VILLAGE, BACJAWAN SUR, CONCEPCION

    Instead of going to the Main Office at Preciosa, Sara, Iloilo, ILECO III conducted an on-site Pre-Membership Seminar to 116 applicants at NHA Village, Bacjawan Sur, Concepcion, Iloilo. This is the first step in applying an electric service connection. The regular pre-membership seminar is held at the Main Office every Tuesday & Thursday. Registration starts… Read more

  • IEC AND BAPA ASSEMBLY IN SITIO NABALAS, CULASI, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in Sitio Nabalas, Culasi, Ajuy, Iloilo with 100 attendees on July 27, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, BACJAWAN NORTE, CONCEPCION

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bacjawan Norte, Concepcion, Iloilo with 104 attendees on July 26, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more