• SCHEDULED POWER INTERRUPTION SA BANWA SANG AJUY SA HUNYO 27, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 27, 2024 (HUWEBES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert sang open secondary line to single phase line kag pag-construct sang tapping pole. Ang lugar nga apektado sang sini nga power interruption sa banwa sang AJUY… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION

    What: NGCP UNSCHEDULED POWER INTERRUPTION Time of power interruption: 7:38 p.m. Time of power restoration: 7:53 p.m. Affected areas: Municipalities of Anilao, Banate, Barotac Viejo and San Rafael Our Technical Team is currently in coordination with the National Grid Corporation of the Philippines (NGCP) for the cause of the said power interruption. Thank you for… Read more

  • SCHEDULED POWER INTERRUPTION sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila AJUY, SARA, BALASAN kag ESTANCIA sa HUNYO 25, 2024

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED POWER INTERRUPTION ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila AJUY, SARA, BALASAN kag ESTANCIA 69 kV Line sa HUNYO 25, 2024 (MARTES). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGAR 4:30… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN NHA VILLAGE, BACJAWAN SUR, CONCEPCION

    Instead of going to the Main Office at Preciosa, Sara, Iloilo, ILECO III conducted an on-site Pre-Membership Seminar to 116 applicants at NHA Village, Bacjawan Sur, Concepcion, Iloilo. This is the first step in applying an electric service connection. The regular pre-membership seminar is held at the Main Office every Tuesday & Thursday. Registration starts… Read more

  • IEC AND BAPA ASSEMBLY IN SITIO NABALAS, CULASI, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in Sitio Nabalas, Culasi, Ajuy, Iloilo with 100 attendees on July 27, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, BACJAWAN NORTE, CONCEPCION

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bacjawan Norte, Concepcion, Iloilo with 104 attendees on July 26, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more