• SCHEDULED POWER INTERRUPTION SA BANWA SANG SAN DIONISIO SA PEBRERO 14, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa PEBRERO 14, 2024 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang SAN DIONISIO amo ang masunod:• Brgy. Amayong• Brgy. Batuan Madamo gid… Read more

  • UNSCHEDULED POWER INTERRUPTION (FEBRUARY 12, 2024)

    Date: February 12, 2024 Time of interruption: 11:15 AM Time of restoration: 12:18 PM Affected areas: Banate Substation Feeder 2-Anilao (portion) Caused: Line fault due to vegetation For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (FEBRUARY 12, 2024)

    Date: February 12, 2024 Time of interruption: 9:25 AM Time of restoration: 9:37 AM Affected area: Dolores, Balasan, Iloilo Activity: Repaired open secondary line cut off For your information. Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. LUMBIA, ESTANCIA, ILOILO

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 05, 2022 (Friday) in Brgy. Lumbia, Estancia, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to one hundred thirty (130) BAPA members of Sitio Pinaypayan and… Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • INDIVIDUAL PROMPT PAYORS FOR JULY 2022 BILLING

    Thank you to our beloved Member-Consumer-Owners (MCOs) for paying your bills promptly. Keep safe always. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, TIPACLA, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Tipacla, Ajuy, Iloilo with 34 attendees on August 04, 2022 (Thursday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more