• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 12, 2023)

    Date: November 12, 2023 (Sunday) Time of interruption: 6:28 PM Time of restoration: 6:45 PM Affected area/s: NHA Village, Calapdan, Estancia Activity: Inspection/clearing due to animal contact and replacement of busted fuse link We apologize for the inconvenience. Thank you for your usual understanding. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 12, 2023)

    Date: November 12, 2023 (Sunday) Time of interruption: 1:45 PM Time of restoration: 3:20 PM Affected area/s: Poblacion, Carles Activity: Repair of cut-off jumper of secondary line We apologize for the inconvenience. Thank you for your usual understanding. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 12, 2023)

    Date: November 12, 2023 (Sunday) Time of interruption: 2:45 PM Time of restoration: 3:20 PM Affected area/s: Banaria St., and portion of Lopez Jaena St., Poblacion, Barotac Viejo Activity: Repair of neutral bushing We apologize for the inconvenience. Thank you for your usual understanding. For your information. Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. LUMBIA, ESTANCIA, ILOILO

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 05, 2022 (Friday) in Brgy. Lumbia, Estancia, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to one hundred thirty (130) BAPA members of Sitio Pinaypayan and… Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • INDIVIDUAL PROMPT PAYORS FOR JULY 2022 BILLING

    Thank you to our beloved Member-Consumer-Owners (MCOs) for paying your bills promptly. Keep safe always. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, TIPACLA, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Tipacla, Ajuy, Iloilo with 34 attendees on August 04, 2022 (Thursday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more