
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
Isa sa mga aktibidades sa pag-selebrar sang 36th Foundation Celebration sang ILECO III, ang madinalag-on nga Handog Tsinelas, Feeding Program and Gift Giving Activity nga ginpatigayon sang Setyembre 29, 2022 (Huwebes) sa Tanao Elementary School nahamtang sa Brgy. Tanao, Batad. Tinutuyo sang sini nga lihok ang makabulig sa aton mga kabataan nga nagakinahanglan sang bulig… Read more
Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more
Kuha-on sa saksakan ang mga appliances nga wala ginagamit. *A friendly reminder from ILECO III. Read more
Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. *A friendly reminder from ILECO III. Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more