• SCHEDULED POWER INTERRUPTION SA BANWA SANG AJUY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang AJUY amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGAR SETYEMBRE 23, 2024 (LUNES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon)… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG CARLES SA SETYEMBRE 24, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 24, 2024 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing of lines. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CARLES amo ang: • Sitio Nangka, Bancal • Sitio Cambalatong,… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BATAD SA SETYEMBRE 23, 2024

    Ang lugar nga apektado sang sini nga power interruption sa banwa sang BATAD amo ang: • Cabagohan (portion) • Tapi-an • Binon-an • Tanao • Alinsolong • Banban Madamo gid nga salamat sa inyo nga paghangop kag padayon nga suporta sa aton kooperatiba. Ang nagapahibalo, ATTY. JAMES G. BALSOMO II, MBA, DM General Manager Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • BAPA JOINT MEETING IN BRGY. TALOKGANGAN, BANATE

    LOOK: ILECO III personnel conducted BAPA Joint Meeting held at Tito Paps, Brgy. Talokgangan, Banate with 131 Attendees from different BAPA Association from Natividad Area Coverage last January 11, 2023 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more