• EMERGENCY PLANT SHUTDOWN SANG NPC-SPUG SA HULYO 13, 2022 TUBTOB HULYO 27, 2022 SA ISLA GIGANTES

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY PLANT SHUTDOWN ang NATIONAL POWER CORPORATION (NPC)- SPUG nga magasugod sa HULYO 13, 2021 (MIYERKULES) tubtob kinse (15) ka adlaw, 7:00 AM- 12:00 NN (lima ka oras ang kalawigon) kag 5:00 PM- 12:00 MN (pito ka oras ang kalawigon) bangud sang load shedding para sa patigayunon nga maintenance… Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 13, 2022)

    Date: July 13, 2022 (Wednesday) Time of interruption: 5:50 AM Time of restoration: 7:45 AM Affected areas: Balunos, Guipis and Manganese, Anilao, Iloilo Cause: Line fault due to animal contact (bat) Activities: Inspection of line and pulled out animal We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 13, 2022)

    Date: July 13, 2022 (Tuesday) Time of interruption: 6:30 AM Time of restoration: 7:31 AM Affected areas: San Rafael (All barangays) and Barotac Viejo (portion) Activity: Repaired source of primary section analyzing cut-out We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ENERGY SAVING TIP

    Use LED lights. Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT(REPUBLIC ACT 11361)

    ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution lines. 2. Pagpatindog… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more