• SCHEDULED POWER INTERRUPTION SA MAYO 20, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 20, 2023 (SABADO), 7:00 AM- 6:00 PM (11 ka oras ang kalawigon) para sa patigayunon nga conversion sang Single Phase Line to Three Phase Line sa Brgy. Poscolon, San Rafael. Ang lugar nga apektado sang sini nga power interruption sa Banwa… Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 16, 2023)

    Date: May 16, 2023 Time of interruption: 10:30 AM Time of restoration: 11:10 AM Affected area: Poblacion Market, Sara, Iloilo (portion) Activity: Installed 50 kVA distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 11, 2023)

    Date: May 11, 2023 Time of interruption: 12:15 PM Time of restoration: 1:45 PM Affected area: Culasi, Ajuy, Iloilo (portion) Activity: Replacement of rotten pole We apologize for the inconvenience. For your information. Read more

  • ON-SITE PMS IN NHA VILLAGE, DALIPE, LEMERY

    ILECO III conducted On-site Pre-Membership Seminar for prospected MCOs at NHA Village, Barangay Dalipe, Lemery yesterday February 27, 2023 (Monday) together with Barangay Electrician Association. It was attended by Ninety Two (92) MCOs and Barangay Officials of Brgy. Dalipe, Lemery. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • HAPPY BIRTHDAY VICE MAYOR IRAN!

    HAPPY BIRTHDAY HON. FILEMON M. IRAN, JR, VICE MAYOR OF BANATE, ILOILO. From ILECO III Family! Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more