
POWER RATES
POWER ADVISORIES
Date: February 28, 2023 Time of interruption: 7:35 PM Time of restoration: 7:56 PM Affected areas: Bulak Norete and Alapasco, Batad, Iloilo Activities: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
Date: February 27, 2023 Time of interruption: 8:27 AM Time of restoration: 9:25 AM Affected area: Mamhut Norte, Balasan, Iloilo (portion) Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
Date: February 27, 2023 Time of interruption: 8:24 AM Time of restoration: 8:55 AM Affected area: Sitio Nabitasan, Poblacion, Balasan, Iloilo Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
System loss is one of the burdens of Electric Cooperatives all over the country, if not controlled and monitored, it is sometimes the reason why higher rates/charges are being added to power bills of Member-Consumer-Owners (MCOs) . Relative to this, The Iloilo III Electric Cooperative Inc. (ILECO III) in coordination with Sara Area Office led… Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more
The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more
Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more