• SUPPLEMENTAL POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ukon INDI MADAYON ang power interruption sa ENERO 27, 2024 (SABADO), 6:00 AM- 4:00 PM (10 ka oras ang kalawigon) para sa pag-clearing sang linya kag pag-ilis sang mga poste kag cross-arms. Ang lugar nga apektado sang sini nga power interruption amo ang masunod:• TANAN NGA BARANGAY SA ANILAO•… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 24, 2024)

    Date: January 24, 2024 Time of interruption: 10:45 AM Time of power restoration: 11:23 AM Affected areas: NHA Village Site 1, Nalumsan, Carles, Iloilo Activity: Repaired transformer supply and jumper loose connection For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 24, 2024)

    Date: January 24, 2024 Time of interruption: 6:43 AM Time of power restoration: 8:46 AM Affected areas: Bolo, Tupaz, Cabuguana, Bancal (portion), Poblacion, Carles, Iloilo Activity: Replaced damage assembly fuse cut-out in Balantian, Balasan For your information. Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • SAFETY TIPS SA PANAHON SANG TAG-ULAN

    1. Patyon ang Main Switch kung nagabaha na sa inyo lugar. 2. Indi pagtandugon ang mga basa nga wirings sang kuryente. 3. Indi magsaka sa mga kahoy bangud possible nga maglatay ang boltahe sang kuryente sa mga basa nga sanga. 4. Pagkatapos mabahaan ang inyo lugar, indi anay pagbuksan ang main switch. Magtawag sang accredited… Read more

  • ENERGY SAVING TIP

    Turn off the lights when not needed. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more