• UNSCHEDULED POWER INTERRUPTION (AUGUST 9, 2023)

    Date: August 9, 2023 (Wednesday) Time of interruption: 1:55 PM Time of restoration: 2:24 PM Affected area: San Nicolas, Sua, Tiabas and Tamangi, San Dionisio Action Taken: Inspection of line and replaced busted fuselink due to field phase cut-out trip-off at Brgy. Aldeguer, Sara We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 9, 2023)

    Date: August 9, 2023 (Wednesday) Time of interruption: 8:28 AM Time of restoration: 10:09 AM Affected area: Pa-on, Daculan and Loguingot, Estancia Action Taken: Inspection and repaired primary and secondary line and replaced busted fuse link. We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA AGOSTO 12, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para patigayunon nga preventive maintenance sa Sara S/s kag pag install sang reclosers sa tatlo ka mga feeder sa nasambit nga S/s. Ang petsa, oras kag lugar nga apektado sang sini nga power interruption amo ang mga masunod: AGOSTO 12, 2023 (SABADO)5:00 AM-… Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more