• POWER ADVISORY

    RESCHEDULED POWER INTERRUPTION Pahibalo sa mga katapo-konsumidores nga ang PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Sara-Estancia Transmission Line Section sa AGOSTO 05, 2023 (SABADO) ang GIN-RESCHEDULED sa AGOSTO 06, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 AM (1… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa AGOSTO 05, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 AM (1 ka oras… Read more

  • EMERGENCY POWER INTERRUPTION (AUGUST 31, 2023)

    Date: August 31, 2023 (Thursday) Time of interruption: 5:28 AM Time of Restored: 5:49 AM Activity: Inspection of line and replaced busted fuse link Affected areas: Pedreña St., Poblacion, Balasan We apologize for the inconvenience. For your information. Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • NATIONAL ELECTRICAL SAFETY MONTH

    ILOILO III ELECTRIC COOPERATIVE, INC. joins in celebrating National Electrical Safety Month 2023. Read more

  • Ngaa may power interruption?

    Read more

  • ILECO III FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more