
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
Paano ang pag-report sang complaints sa ILECO III? 1. Magtawag ukon mag-text.ILECO III Contact Numbers:SARA AREA OFFICE – 0919-069-7391NATIVIDAD AREA OFFICE – 0919-069-7403PANI-AN AREA OFFICE – 0919-069-7396Kalakip ang mga masunod nga impormasyon:PANGALAN kag ADDRESS 2. Magpadala sang mensahe sa ILECO III Facebook Page.Kalakip ang mga masunod nga impormasyon:PANGALANADDRESSCONTACT NUMBER 3. Magbisita sa Area Office.ILECO III… Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins with “Anilaonon” in celebrating their Feast of Sta. Rita de Casia an Annual Municipal Town Fiesta of Anilao, Iloilo, May 22, 2023. Read more
Keep lit candle away from flammable materials. Read more
ANO ANG REQUIREMENTS KUNG MAG-APPLY SANG SENIOR CITIZEN DISCOUNT? Read more
BIDS AND NOTICES
Procurement of Distribution Transformer Loss Tester Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more