• SCHEDULED POWER INTERRUPTION SA BANWA SANG BANATE SA SETYEMBRE 6, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 06, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod:• Poblacion (portion)• Bularan (portion)• Talokgangan• San Salvador… Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 2, 2023)

    Date: September 02, 2023 (Saturday) Time of interruption: 6:05 AM Estimated time of restoration: NOT YET DETERMINED Affected Areas: All barangays in San Rafael, Iloilo Cause/Reason: Damaged poles and lines due to vehicle accident Our technical team is currently preparing for immediate power restoration. We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (SEPTEMBER 1, 2023)

    Date: September 1, 2023 (Friday) Time of interruption: 7:00 AM Time of Restored: 7:30 AM Activity: Inspection of line and re-fusing primary cut-out. Affected areas: Poblacion, Barotac Viejo We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. Read more

  • ENERGY SAVING TIP

    Read more

  • FIRE SAFETY TIP

    Keep a fire extinguisher within reach. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more