• UNSCHEDULED POWER INTERRUPTION (FEBRUARY 15, 2024)

    Date: February 15, 2024 (Thursday) Time of interruption: 9:10 AM Time of restoration: 1:30 PM Affected areas: Preciosa, Sara, Iloilo Activities: Replacement of rotten poles and repaired of leaning pole For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG CONCEPCION SA PEBRERO 19, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa PEBRERO 19, 2024 (LUNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert sang linya kag pag-ilis sang poste. Ang lugar nga apektado sang sini nga power interruption amo ang: • Sitio Punta Luis, Poblacion, Concepcion Madamo gid nga… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BAROTAC VIEJO SA PEBRERO 17, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa PEBRERO 17, 2024 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang masunod:• Bugnay• California• Dela Peña• La Fortuna•… Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. Read more

  • ENERGY SAVING TIP

    Read more

  • FIRE SAFETY TIP

    Keep a fire extinguisher within reach. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more