• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022Time of interruption: 4:47 PMTime of Restoration: NOT YET DETERMINED Cause of interruption: Line fault due to bad weatherAffected areas:SAN DIONISIO – All barangaysSARA (portion)CONCEPCION- Aglosong Our Maintenance Team is currently conducting inspection of lines. We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 19, 2022 SA BANWA SANG AJUY KAG SARA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 19, 2022 (SABADO), 8:00 AM- 5:00 PM ( 9 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang AJUY kag SARA amo ang masunod: AJUYTanan nga barangay magluwas sa:•… Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 19, 2022 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 19, 2022 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-construct sang Double Circuit Line halin sa Poblacion, Banate pakadto sa Carmelo, Banate para sa ginapatigayon nga on-going Banate Substation. Ang lugar nga apektado sang sini nga… Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more