• SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA DISYEMBRE 4, 2022 SA ANILAO, BANATE, BAROTAC VIEJO KAG SAN RAFAEL

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa DISYEMBRE 04, 2022 (DOMINGO), 6:00 AM- 6:00 PM (12 ka oras ang kalawigon). Ang apektado nga lugar sang power interruption amo ang masunod: • ANILAO• BANATE• BAROTAC VIEJO• SAN RAFAEL… Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 25, 2022)

    Date: November 25, 2022 Time of interruption: 7:15 PM Time of Restoration: 7:48 PM Cause of interruption: Damage jumper and secondary bushing. Affected areas: Portion of Brgy.Villa Pani-an, Estancia We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 25, 2022)

    Date: November 25, 2022 Time of interruption: 11:03 AM Time of Restoration: 11:50 AM Cause of interruption: Installation of private transformer (Bayside) Affected areas: Portion of Brgy. Poblacion, Banate We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more