• NGCP’s UNSCHEDULED POWER INTERRUPTION (UPDATE)

    DATE: April 28, 2023 (Friday)Time of interruption: 2:55 PMEstimated Time of power restoration: NOT YET DETERMINED Affected areas: Sara, Lemery, Ajuy, San Dionisio, Concepcion, Batad, Estancia, Balasan, Carles, Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: Over voltage of transmission line of NGCP We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 28, 2023)

    Date: April 28, 2023 (Friday) Time of interruption: 12:39 PM Time of restoration: 12:43 PM Affected areas: Banate Substation Feeder 2 Cause of power interruption: Transient line fault We apologize for the inconvenience. For your information. Read more

  • Pahibalo sa tanan nga katapo-kunsomidor sang ILECO III

    https://web.facebook.com/NGCPph/posts/pfbid038FGkA3YhMsE9nez7EejR2gu5SnoZSeKA15hycVuRXtvdk3bJAfo4RvUd58J4u7wWl Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more