• EMERGENCY POWER INTERRUPTION (APRIL 4, 2023)

    Date: April 04, 2023 (Tuesday) Time of interruption: 12:40 PM Estimated time of restoration: 12:55 PM Affected ares: Banate Substation Feeder 2 Cause: To troubleshoot primary line jumber (cutoff) at Dangulaan, Anilao, Iloilo. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 3, 2023)

    Date: April 03, 2023 Time of interruption: 2:30 PM Time of restoration: 3:20 PM Affected area: San Juan Crisostomo, Anilao, Iloilo Activity: Replacement of damaged distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 3, 2023)

    Date: April 03, 2023 Time of interruption: 9:45 AM Time of restoration: 10:55 AM Affected area: Guinticgan, Carles, Iloilo Activity: Re-sagging of two span open secondary line We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more