• SCHEDULED POWER INTERRUPTION SA BANWA SANG BALASAN SA DISYEMBRE 5, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa DISYEMBRE 05, 2023 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag relocate sang Single-Phase Line nga apektado sang DPWH road widening project sa Brgy. Pasayan, Batad. Ang lugar nga apektado sang sini nga power interruption amo ang… Read more

  • SCHEDULED POWER INTERRUPTION SA DISYEMBRE 1, 2023 SA BANWA SANG BALASAN

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa DISYEMBRE 01, 2023 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa BALASAN amo ang masunod: • Mamhut Sur• Mamhut Norte Madamo gid nga salamat sa… Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION (NOVEMBER 27, 2023)

    DATE: November 27, 2023 (Monday) Time of interruption:Natividad Substation: 9:45 AMBanate Substation: 9:42 AM Time of power restoration:Natividad Substation: 10:27 AMBanate Substation: 10:28 AM Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: Under frequency of Dingle Substation We apologize for the inconvenience. For your information.  Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more