
POWER RATES
POWER ADVISORIES
Date: December 26, 2023(Tuesday) Time of interrption : 6:10 PM Time of restoration : 7:05 PM Affected area: Concepcion Activity: Inspection/clearing of line due to animal contact (gecko) and replace pin insulator. We apologize for the inconvenience. For your information. Read more
DATE: December 20, 2023 (Wednesday) Time of interruption: 1:28 AMTime of power restoration: 2:13 AM Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: Tripping of 69 kV BUS 2 on Dingle Substation We apologize for the inconvenience. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED POWER INTERRUPTION sang ILECO III sa DISYEMBRE 13, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) ang GIN-RESCHEDULE sa DISYEMBRE 16, 2023 (SABADO) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga… Read more
NEWS AND UPDATES
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more
Dry your clothes and dishes naturally. Read more
HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more
Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more