• UNSCHEDULED POWER INTERRUPTION(NOVEMBER 3, 2022)

    Date: November 3, 2022 Time of interruption: 5:48 PM Time of Restoration: 6:56 PM Affected Area: Proper, San Lucas, Barotac Viejo Reason/Activity: Line fault due to vegetation/ Clearing of lines and repaired secondary bushing of 15kVa transformer supply. We apologize for the inconvenience. For your information. Read more

  • ENERGIZATION OF TRANSFORMER AND INSULATION OF THREE PHASE PRIVE TRANSFORMER IN BRGY. CANO-AN, ESTANCIA

    ILECO III Technical personnel conducted energization of Stephen T. Lao 3-25kVA Transformer and insulation of Three (3) Phase Private Transformer resulted to 4 to 5 hrs. of power interruption (under built) at Brgy. Cano-an, Estancia, today November 3, 2022 (Thursday). Keep safe Warriors of Light For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 3, 2022)

    Date: November 3, 2022 Time of interruption: 10:00 AM Time of Restoration: 11:30 AM Affected Area: Sitio Baldusano, Omio, Lemery Reason/Activity: Line fault due to vegetation/ Clearing of lines and repaired neutral cut-off We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more