
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins “Saranhon” and “Banatenhon” in their celebration of Feast of San Juan De Bautista an Annual Town Fiesta, June 24, 2023 (Saturday). Happy Fiesta mga ka Member-Consumer-Owners! Read more
For your information. National Electrification Administration Read more
Some of the agenda presented to the above-mentioned attendees were the following: a. Status of Operationb. Damaged Solar PVMc. Coop Updatesd. Open Forum The Information Education Campaign (IEC) is part of ILECO III’s empowerment program to our Member-Consumer-Owners. Series of meetings were conducted to inform the members of the status of operation and important matters… Read more
BIDS AND NOTICES
Improvements of the Distribution Line in Natividad Feeder 3 & Pani-an Feeder 2 Read more
Disposal of Non-Performing Assets Read more
Procurement of Boom Truck for Maintenance Use Read more