• NGCP’s UNSCHEDULED POWER INTERRUPTION

    DATE: July 05, 2023 (Wednesday) Time of interruption:Barotac Viejo S/s: 8:50 PMBanate S/s: 8:50 PM Estimated Time of power restoration: NOT YET DETERMINED Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: UNDER INVESTIGATION Our technical team is closely coordinating with NGCP for the power restoration. We apologize for the inconvenience. For… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG SAN DIONISIO, SARA KAG CONCEPCION SA HULYO 8, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-relocate sang mga poste nga apektado sang DPWH widening project sa Poblacion, Sara, pag-ilis sang mga guba nga poste kag pin insulators kag pag-construct sang Single Phase Line Structure. Ang petsa, oras kag lugar nga apektado sang sini nga power interruption… Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION

    DATE: July 05, 2023 (Wednesday) Time of interruption: 4:31 AMEstimated Time of power restoration on the ff. ILECO III S/s Barotac Viejo S/s: 9:35 AMBanate S/s: 9:36 AM Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Kindly report using our messenger on our Facebook Page or call the following contact details of our area… Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more