• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2022)

    Date: November 11, 2022Time of interruption: 3:33 PMTime of Restoration: 4:41 PM Cause of interruption: Line fault due to damaged pin insulator in front of PET Gasoline Station Affected areas: Brgy. Aspera, Brgy. Antonio Yusay and Brgy. Poblacion Ilaya, Sara, Iloilo We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2022)

    Date: November 11, 2022Time of interruption: 10:05 AMTime of Restoration: 10:44 AM Cause of interruption: Transient line fault Affected areas: Brgy. Aspera, Brgy. Antonio Yusay and Brgy. Poblacion Ilaya, Sara, Iloilo We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2022)

    Date: November 9, 2022 Time of interruption: 6:40 PM Time of Restoration: 7:45 PM Affected Area: Villahermosa, Sara, Cabantohan, Dapdapan, Omio, Marapal, Alcantara, Yawyawan, Layog Bato and Sitio Talaytay, Poblacion, Lemery Activity: Duplex wire contacted primary line due to vehicular incident in Brgy. Arante, Sara We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more