• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022Time of interruption: 4:47 PMTime of Restoration: NOT YET DETERMINED Cause of interruption: Line fault due to bad weatherAffected areas:SAN DIONISIO – All barangaysSARA (portion)CONCEPCION- Aglosong Our Maintenance Team is currently conducting inspection of lines. We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 19, 2022 SA BANWA SANG AJUY KAG SARA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 19, 2022 (SABADO), 8:00 AM- 5:00 PM ( 9 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang AJUY kag SARA amo ang masunod: AJUYTanan nga barangay magluwas sa:•… Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 19, 2022 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 19, 2022 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-construct sang Double Circuit Line halin sa Poblacion, Banate pakadto sa Carmelo, Banate para sa ginapatigayon nga on-going Banate Substation. Ang lugar nga apektado sang sini nga… Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more