• POWER ADVISORY UPDATE as of 6:00 p.m., April 29, 2023

    Sa subong nga ti-on ang mga energized nga mga feeders amo ang mga masunod: Sara Substation- Feeders 1 to 3 remain online except for Feeder 4 due to rotational brownout and was shutdown @ 4:40 PM Ajuy Substation – Feeder 1 was shutdown (Portion sang Ajuy kag Concepcion) 4:39 PM due to rotational brownout Banate… Read more

  • POWER ADVISORY UPDATE as of 5:00 p.m., April 29, 2023

    Sa subong nga ti-on ang mga energized nga mga feeders amo ang mga masunod: Sara Substation- All Feeders are back online Ajuy Substation – Feeder 1 Energized (Portion sang Ajuy kag Concepcion) 10:55 AM Banate Substation – Not yet Energized Balasan Substation – Energized @ 4:46 PM due to Rotational Brownout Daan Banwa Substation –… Read more

  • PAHIBALO SA MGA KATAPO-KUNSUMIDOR

    Ang gin-allocate nga 11 megawatts sang NGCP sa ILECO III ang maga-drop na lamang sa 6 megawatts. Pagabuhinan karon sang 5 megawatts sugod alas-singko sang hapon ang load allocation sa rason nga tama gid ka kulang sa subong ang supply sang kuryente sa isla sang Panay. Ang ini nga kakulangan sang supply ang dulot sang… Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more