• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022Time of interruption: 4:47 PMTime of Restoration: NOT YET DETERMINED Cause of interruption: Line fault due to bad weatherAffected areas:SAN DIONISIO – All barangaysSARA (portion)CONCEPCION- Aglosong Our Maintenance Team is currently conducting inspection of lines. We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 19, 2022 SA BANWA SANG AJUY KAG SARA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 19, 2022 (SABADO), 8:00 AM- 5:00 PM ( 9 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang AJUY kag SARA amo ang masunod: AJUYTanan nga barangay magluwas sa:•… Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 19, 2022 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 19, 2022 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-construct sang Double Circuit Line halin sa Poblacion, Banate pakadto sa Carmelo, Banate para sa ginapatigayon nga on-going Banate Substation. Ang lugar nga apektado sang sini nga… Read more

  • UNDERSTANDING THE POWER BILL AND RATE COMPOSITION

    Ang tanan nga rate sang isa ka Electric Cooperative (EC) gina-approve sang Energy Regulatory Commission (ERC) bag-o ini paga-sukton sa mga konsumidor. Ano bala ang ka-undan sang aton mga power bill kag diin ini nagakadto? GENERATION SYSTEM CHARGEIni ang ginasukot sang mga Electric Cooperatives para bayaran ang ginakuha nga kuryente halin sa mga power suppliers.… Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after… Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNITBuy an aircon with high Energy Efficiency. Ratio indicated in the yellow label.Change or clean your AC’s air filters regularly.Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs.Repair leaky ducts to reduce heating and cooling costs.Decorate for a cooler home by hanging light-colored curtains… Read more

  • HAPPY BIRTHDAY VICE MAYOR BALIDA!

    Happy birthday HON. ERNESTO R. BALIDA, Municipal Vice Mayor- Batad, Iloilo. From ILECO III Family! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more