• ON-GOING REPAIR OF TOPPLED POLE IN BRGY. RIZAL, BAROTAC VIEJO

    ILECO III Technical personnel conducted on-going repair of a toppled pole due to erosion at Sitio Cagay Brgy. Rizal, Barotac Viejo today, October 28, 2022 (Friday). Keep safe Warriors of Light For your information. Read more

  • KANSELADO ANG SCHEDULED POWER INTERRUPTION SA OKTUBRE 28, 2022

    Pahibalo sa mga katapo-konsumidores nga KANSELADO SCHEDULED POWER INTERRUPTION sang ILECO III para sa pag-clearing sang lateral lines. Ang petsa, oras kag lugar nga apektado sang sini nga power interruption sa banwa sang Estancia kag Carles amo ang masunod: OKTUBRE 28, 2022 (BIYERNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)ESTANCIA:• Bulaqueňa• Gogo• Tacbuyan CARLES:•… Read more

  • SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA NOBYEMBRE 5, 2022

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Balasan-Estancia Transmission Line Section kag Concepcion Substation sa NOBYEMBRE 05, 2022 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 4:00 AM- 7:00 AM(3 ka oras ang… Read more

  • 2025 Regional Lineman Rodeo Competition (Region VI)

    LOOK: ELECTRIC COOPERATIVES ASSOCIATION OF REGION VI (ECAR VI) kag Philippine Association of Technical Managers of Electric Cooperative – Region VI (PHILATMEC-VI) nagpatigayon sang 2025 REGIONAL LINEMEN RODEO COMPETITION sang MARSO 21, 2025 (Biyernes) sa ILECO III Grounds, Brgy. Preciosa, Sara, Iloilo. Ginbuylogan ini sang mga miyembro nga Coops sang ECAR VI (Aklan Electric Cooperative… Read more

  • 2025 Regional Lineman Rodeo Competition (Region VI)

    https://www.facebook.com/ILECO3/videos/751448064210493 Read more

  • ATTENTION KA-MCO!

    ILECO III is Hiring! Be part of our growing family. Apply Now! Read more

  • BAPA Area Assembly in Pani-an Area Coverage

    LOOK: ILECO III successfully conducted the BAPA Area Assembly in Pani-an Area Coverage attended by BAPA Chairmen and Vice-Chairmen for Finance from Batad, Balasan, Estancia and Carles at Noli’s Mansion, Tabuan, Estancia Iloilo on March 19, 2025 (Wednesday). In addition, ILECO III headed by Atty. James G. Balsomo II, acknowledges the crucial role of BAPAs… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more