• SCHEDULED LOAD TRANSFER OF NGCP ON APRIL 9, 2022

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69kV Panitan-Sara Transmission Line sa ABRIL 09, 2022 (SABADO), 6:00 AM- 8:00 AM(2 ka oras ang kalawigon) kag 4:00 PM- 6:00 PM (2 ka oras ang kalawigon). Ang oras kag apektado nga lugar sang… Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 5, 2022)

    Date: April 5, 2022 (Tuesday)Time of interruption: 12:15 PMTime of restoration: 2:50 PMAffected area: Sitio Hambad, Vista Alegre, Barotac Viejo, IloiloActivity: Pole relocationWe apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION TODAY, APRIL 5, 2022

    Date: April 5, 2022 (Tuesday)Time of interruption: 10:00 AMTime of restoration: 11:31 AMAffected area: Calangag, Batad, IloiloActivities: Repaired of secondary jumper loose and correction of leaning poleWe apologize for the inconvenience. For your information. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more