• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 22, 2022)

    Date: September 22, 2022 Time of interruption: 5:35 AM Time of Restoration: 6:16 AM Affected Area: Brgy. Zaragosa, Balasan Activity: Inspection of line and replaced fuselink We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA SETYEMBRE 24 KAG 28, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-construct sang Double Circuit line halin sa Poblacion, Banate pakadto sa Carmelo, Banate. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod: PETSA , ORAS KAG APEKTADO NGA LUGAR SETYEMBRE 24,… Read more

  • ILECO III POWER ADVISORY (Update as of 9:20 p.m.)

    What: UNSCHEDULED POWER INTERRUPTION Date: September 16, 2022 (Friday) Time of interruption: 6:53 PM Time of restoration: 9:10 PM Affected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAEL Cause: Loose connection of 69kv disconnect switch of Natividad Substation Thank you for bearing with us. We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Avoid overnight charging. Read more

  • FEAST OF IMMACULATE CONCEPTION

    Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang DISYEMBRE 8, 2023 (BIYERNES), ang gin-deklara nga SPECIAL NON-WORKING HOLIDAY sa bug-os nga pungsod, para sa pag-obserba sang “IMMACULATE OF CONCEPTION OF MARY” base sa Proclamation No. 368 S. 2023. Bangud sini, SARADO ang ILECO III Main Office kaupod ang Area Offices (Sara, Natividad kag Pani-an). May ara sang… Read more