• POWER ADVISORY

    RESCHEDULED POWER INTERRUPTION Pahibalo sa mga katapo-konsumidores nga ang PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Sara-Estancia Transmission Line Section sa AGOSTO 05, 2023 (SABADO) ang GIN-RESCHEDULED sa AGOSTO 06, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 AM (1… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa AGOSTO 05, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 AM (1 ka oras… Read more

  • EMERGENCY POWER INTERRUPTION (AUGUST 31, 2023)

    Date: August 31, 2023 (Thursday) Time of interruption: 5:28 AM Time of Restored: 5:49 AM Activity: Inspection of line and replaced busted fuse link Affected areas: Pedreña St., Poblacion, Balasan We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • BOLA PARA SA PAG-ASA

    As part of the cooperative’s wellness program, ILECO III conducted a Corporate Social Responsibility dubbed, “BOLA PARA SA PAG-ASA” that aims to foster harmonious relationship and strong bond with our valued MCOs, partner organizations and other stakeholders. The Friendship Basketball Game was organized between ILECO III Warriors and Brgy. Guinticgan All Star Basketball Team in… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more