• EMERGENCY POWER INTERRUPTION TODAY, JULY 8, 2022

    Date: July 08, 2022 (Friday) Time of interruption: 9:07 AMTime of restoration: 9:21 AM Affected areas: Batad (All barangays) and Estancia (portion) Activity: Replacement of damaged pin insulator and suspension insulator in Calapdan, Estancia We apologize for the inconvenience. For your information. Read more

  • MANUAL LAOD DROPPING (MLD) SANG NGCP SUBONG NGA HULYO 7, 2022

    Ginapahibalo ang tanan nga mga katapo-konsumidores sang ILECO III nga mag-preparar sa POSIBLE magaluntad nga power interruption sa inyo nga lugar nga magadugay sang 1-2 oras sugod subong nga gab-I, Hulyo 07, 2022 (Huwebes) para sa pag-implementar sang ROTATING POWER INTERRUPTION sang aton Kooperatiba bangud sang MANUAL LOAD DROPPING (MLD) sang National Grid Corporation of… Read more

  • REFILLING OF SF6 GAS IN DAAN BANWA 69KV CIRCUIT BREAKER TODAY, JULY 7, 2022

    ILECO III personnel conducted and facilitated refilling of SF6 Gas in Daan Banwa 69kv Circuit Breaker, today, July 07, 2022 (Thursday), 12:00 NN- 1:00 PM. We apologize for the inconvenience. For your information. Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2024

    For your information. Read more

  • GRID ALERT STATUS FROM NGCP

    𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more