
POWER RATES
POWER ADVISORIES
Date: September 8, 2022 Time of interruption: 7:21 PM Time of Restoration: 7:44 PM Affected Area: Binon-an, Alinsolong and Ban-Ban, Batad Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more
Date: September 8, 2022 Time of interruption: 6:56 AM Time of Restoration: 9:15 AM Affected Area: Tabugon Proper and Tabugon Minor, Carles (Island) Activity: Inspection of line and replaced busted fuselink and change defective kWhr Meter We apologize for the inconvenience. For your information. Read more
Date: September 7, 2022 Time of interruption: 7:05 PM Time of Restoration: 7:35 PM Affected Area: Sitio Cawayan Sulod, Cawayan, Carles Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more
For your information. Read more
𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more
GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more
BIDS AND NOTICES
Procurement of Distribution Transformer Loss Tester Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more