• UNSCHEDULED POWER INTERRUPTION (OCTOBER 28, 2022)

    Date: October 28, 2022 Time of interruption: 6:13 PM Time of Restoration: 7:15 PM Affected Area: Balantian, Balasan Reason/Activity: Line fault due to heavy rain and lightning surge/ Inspection of line and replaced busted fuse link. We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 28, 2022)

    Date: October 28, 2022 Time of interruption: 5:24 PM Time of Restoration: 6:48 PM Affected Area: Lawis, Balasan Reason/Activity: Line fault due to secondary jumper cut-off/ Repair secondary jumper cut-off and re-fusing We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more

  • REPAIR OF SECONDARY JUMPER OF TRANSFORMER LOOSE CONNECTION IN BOTONON, ESTANCIA

    ILECO III Technical personnel repaired the secondary jumper of the transformer loose connection at Brgy. Botongon, Estancia today, October 28, 2022 (Friday). Keep safe Warriors of Light For your information. Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2024

    For your information. Read more

  • GRID ALERT STATUS FROM NGCP

    𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more