• UNSCHEDULED POWER INTERRUPTION (JANUARY 18, 2023)

    Date: January 18, 2023 Time of interruption: 2:13 PM Time of restoration: 3:20 PM Affected areas: JM Basa St., Pase (portion) and Capinang, San Dionisio, Iloilo Activity: Construction/Insertion of 35 ft steel pole due to sagging three phase line We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 17, 2023)

    Date: January 17, 2023 Time of interruption: 11:05 AM Time of restoration: 1:30 PM Affected area: Brgy. San Salvador, Banate, Iloilo Activity: Replaced rusty steel poles We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 16, 2023)

    Date: January 16, 2023 (Monday )Time of interruption: 1:25 PM Time of restoration: 2:05 PM Affected area: Drancalan, Batad, Iloilo Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2024

    For your information. Read more

  • GRID ALERT STATUS FROM NGCP

    𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more