• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 15, 2022)

    Date: September 15, 2022 Time of interruption: 8:00 AM Time of Restoration: 9:40 AM Affected Area: Sitio Daga Bagacay, San Dionisio, San Rafael Activity: Inspection of line and replaced fuselink due to animal contact (bat) We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA SETYEMBRE 19, 29 KAG 30, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-ilis sang poste, pag-convert kag pag-construct sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGARSETYEMBRE 19, 2022 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) •… Read more

  • SCHEDULED POWER INTERRUPTIONS SA SETYEMBRE 17, 19 KAG 20, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga pag-clearing sang mga linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: SETYEMBRE 17, 2022 (SABADO)8:00 AM- 4:00 PM(8 ka oras ang kalawigon)• Sitio Lo-ong Bukid, Lo-ong, Concepcion SETYEMBRE 19, 2022 (LUNES)8:00… Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more